Engineer Gear Pump, Discharge Pump for Reaction Vessel

Engineer Gear Pump, Discharge Pump for Reaction Vessel

CZPT Pump for Reaction Kettle

This sort of GM-LK collection melt pump installed underneath the reaction kettle as discharge pump 

GM-LK series melt pump is mostly utilized for transporting medium or high viscosity medium out of the vacuum response kettle&interval On foundation of massive suction inlet flange style&comma the high viscosity medium is able to absorb inside of beneath vacuum conditions&time period This sequence of melt pump is largely relevant for Abs&comma PS&comma PMMA&comma PBT&comma PT&comma and so forth&interval
 
CZPT Parameter
Content for CZPT Pump Entire body&colonCZPT Metal
Content for Gear&colon M2 Metal &lparOptional&rpar
Material for Sliding Bearing&colon Higher Temperature Device Steel or CZPT Metal
Shaft CZPT&colon Packing CZPT
Heating System&colon Heating Medium or Conduction Oil &lparZB-K sequence melt pump adopts electrical heating&period of time&rpar
Design&solFlow Assortment&colon &period5CC – 2500CC&comma &period5cm3&solrev – 2500cm3&solrev

CZPT info&colon
one&time period Rotate pace&colon ≤ 60rpm&lparAdjustable&rpar
2&time period Temperature&colon 400° C &lparmax&period &rpar
three&time period Max&period of time Outlet strain&colon 350Bar
four&period Max&period CZPTential force&colon 275Bar
five&period Heating technique&colon CZPT Steel Cartridge Heater
6&time period CZPTening elements&colon 12&period9 substantial-toughness screws
7&time period Voltage&colon 380V&lparOthers are optional&rpar
8&period Frequency&colon 50Hz&lparOthers are optional&rpar

Rewards of Implementing CZPT GM-LK series CZPT gear Pump&colon
1&period Reducing anxiety on the extruder by implies of shifting the task of building force to the melt pump&semi

two&time period Growing the hourly output&semi

three&period Taking away the output versions and stress pulsations&comma hence tremendously improving the solution good quality&semi

four&interval Conserving raw materials by implies of tighter producing tolerances&semi

five&interval Bettering the the dimensional precision in the course of the manufacturing of sheets and profiles&semi

6&period of time Optimizing the surface and optical good quality in the course of the manufacturing of films&comma sheets and profiles&semi

seven&period Bettering the solution high quality with regard to homogeneity and pellet size in compounding&semi

8&time period Extending the life span of the upstream equipment&semi

Item show 

Installation of this kind of pump 

CZPT info
 

Type
 
Quantity
&lparcc&solr&rpar
Max roate speed
&lparr&solmin&rpar
Outlet strain
&lparMPa&rpar
Inlet force
&lparMPa&rpar
Fee of flow       m3&solh Temperature
 
Minimal viscosity material
1-1000Pa·s
Large viscosity materials
one thousand~8000Pa·s
 
CZPT-substantial viscosity materials
>&equals8000Pa·s
GM-LK-100 100 100 ≤35 Vacuum~5&period0 ≤0&period51 ≤0&period36 ≤0&period21 ≤350ºC
GM-LK-160 160 one hundred ≤0&period82 ≤0&period57 ≤0&period34
GM-LK-200 two hundred a hundred ≤1&period0 ≤0&period7 ≤0&period4
GM-LK-250 250 one hundred ≤1&period3 ≤0&period9 ≤0&period5
GM-LK-355 315 a hundred ≤1&period6 ≤1&period1 ≤0&period7
GM-LK-500 500 100 ≤2&period6 ≤1&period8 ≤1&period1
GM-LK-750 750 80 ≤3&period1 ≤2&period1 ≤1&period3
GM-LK-1250 one thousand 80 ≤4&period1 ≤2&period9 ≤1&period7
GM-LK-2000 2500 eighty ≤10 ≤7 ≤4
GM-LK-3150 3150 eighty ≤13 ≤9 ≤5
GM-LK-4500 4500 60 ≤14 ≤10 ≤6
GM-LK-6300 6300 sixty ≤19 ≤13 ≤8
GM-LK-8000 8000 sixty ≤24 ≤17 ≤10
GM-LK-12000 12000 50 ≤31 ≤21 ≤13
GM-LK-25000 25000 fifty ≤64 ≤45 ≤27
Remark&colonthe soften equipment pump movement is linked with the function speed&comma substance viscosity&comma force&comma
So the product assortment make sure you ask for us&period of time
 

 
CZPT inspection
 We take only firstclass steel and check every production procedure to ensure every dimension is produced precisely&period A final complete inspection will be executed  before delivery&period  
 
Commissioning
We provide the operation manual for customers to gudie to install the screen changer&comma and at the requirement of user&comma salers should send technician to install and commissioning the die at site of Buyers&comma expenses of the trip should be borne by Buyers&interval
 
Following-sales service
12 months with proper operation by user&comma all the spare parts shall be replaced free of charge under guarantee period&comma fee for transportation and packing will be borne by users&period of time
 
 
About CZPT
 
HangZhou Great CZPTry Co&interval&commaLtd&comma a high-tech company with deep technology background and strong work team and services in China&period Our global team is dedicated to equipping our customers with the competitive solutions&period Our business across the hydraulic screen changer&sol melt filter&comma melt gear pump&comma extrusion dies&commaand plastie recycling granulator&interval
CZPT is a  rapidly growing company&comma it has a large number of sensior technicians and and full of passion and ambitious young people&period  the deep technical background and  sense of responsibility  work team determine it is standing on  a high starting point&period  
We do not just supply  the products &comma but also provide value-added  solutions to more customers in more markets all around the world &period In the process&comma we’re helping manufacturers everywhere improve productivity&comma cut costs&comma increase energy efficiency&comma eliminate scrap&comma reduce cycle times and do whatever else it takes to succeed in today’s complex global economy&time period
Our team is  committed to provide customers the best products with ever improving design&period Strict production and quality control&commaand the perfect pre-sales and post-sales services&time period
We are on the way to be your most reliable and trustworthy partner&comma now more than ever&interval
 
Ideas for customers
How to decide on a most suited variety of display screen changer for your extrusion line &quest
After the products provider generating a dimension recommendation and then you must execute your personal investigation to verify suitable sizing&period of time That way&comma you will have the gain of independent analyses and&comma ideal of all&comma there is no added expense&time period
Understand the distinction in between price tag and value&period Be certain to consider into consideration all of the variables and appear at all the aspects to figure out the true price of possession for the monitor changer&period Some of the hidden variables to consider could be&colon
&bulletProduct quality&period
&bulletMaintenance&comma time and cost of areas&period
&bulletProcess downtime and cost&time period
&bulletLife expectancy for the gear and amortized price of possession&interval
&bulletCost and availability of filtration media&interval
&bulletPressure loss and influence on line output and product good quality&time period
&bulletOperator protection&period of time
&bulletRequired operator intervention and labor price&time period
If all of these and other factors are taken into thing to consider&comma you can pick the most suited answer&comma and then you can count on a much better return on investment&period of time
 

Engineer Gear Pump, Discharge Pump for Reaction Vessel